Skip to content

Terrazzo Mandalay Bay

This multi-phase construction project involved the demolition and removal of 31,000 square feet of existing concrete flooring, followed by the installation of new terrazzo flooring throughout the casino and convention corridor. The project required precise coordination, detailed phasing, and innovative problem-solving to minimize disruption in an active facility.

The Westin Lobby

The Westin Lobby in Las Vegas underwent a complete transformation with the demolition and remodel of the first and second-level common areas. The project reimagined the lobbies, restrooms, check-in area, bar, and restaurant, creating a modern and inviting space

Gold Coast Restrooms

This project involved the complete remodel of Restrooms #1–4 at the Gold Coast in Las Vegas. Scope of work included demolition of existing finishes and the installation of new flooring, wall coverings, plumbing fixtures, and lighting systems. The renovation modernized the spaces with durable, high-performance materials while enhancing both functionality and guest comfort

Uber Lounge & Pick-up

Design-Build project allowing for early completion. CARMA exceeded the owner’s budget and scheduling expectations. The project included metal panels, striping, bromic heaters, and FF&E.

California Exterior Remodel

This project involved the comprehensive repainting of the parking garage and exterior podium structures for both towers, requiring detailed surface preparation, access coordination, and phased execution to minimize disruption to daily operations.

Harrah’s Restroom Remodel

This project required extreme coordination with the hotel being the restrooms were in the front-of-the-house on the casino floor. Coordination was of the upmost concern and the project was executed flawlessly.